
CCS-Standard Engineering
All CAD/CAM nesting and construction drawings follow CCS standards, and critical welds are checked by ultrasonic testing.
Home » Commercial Boats » Patrol Boats
The 9.5m model carries a crew of 6 and the 11m model a crew of 10. Choose the larger boat when boarding or inspection teams travel with the boat crew, or when your shifts call for more people on board.
Fuel capacity decides how long the boat can stay out between refueling: 410 liters on the 9.5m model and 870 liters on the 11m. Tell us your patrol area and shift length, and we will confirm the engines and tank size.
Both models have deep-V monohulls for stable, predictable handling in rough water. Design drafts of 0.5m (1.6 ft) on the 9.5m and 0.4m (1.3 ft) on the 11m let them work close to shore and in shallow harbors.
Coast guards, police, and port security agencies usually buy through public tender. We build to your technical specification, send drawings for approval before production starts, and finish the boat in your agency’s colors and markings.
| Model | Length × Beam | Crew | Design Draft | Fuel Tank |
|---|---|---|---|---|
| 9.5m Aluminum Patrol Boat | 9.5m × 2.85m | 6 | 0.5m | 410 liters |
| 11m Aluminum Patrol Boat | 11m × 3.3m | 10 | 0.4m | 870 liters |
The 11m model carries a larger crew, more than twice the fuel, and has a side cabin door as well as a front door for quicker boarding and inspection work. The 9.5m model is the more compact choice for harbor and near-shore patrol.
Yes. Layout, seating, colors, and agency markings can be built to your specification, and we review the technical requirements with you before production starts.
Yes. 5083 marine aluminum resists salt-water corrosion and stands up to hard daily use with little maintenance, and a damaged hull can be repaired by welding.
Our patrol boat guide covers the patrol area and mission, crew size, range and fuel, hull and draft, boarding access, tender requirements, and the buying process step by step.
Engineering, certified welding, testing, and export support from a single supplier.

All CAD/CAM nesting and construction drawings follow CCS standards, and critical welds are checked by ultrasonic testing.

Every welder holds a welding qualification certificate and has at least five years of experience, using TIG and MIG processes on certified 5083-H116 plate.

Each boat passes hull strength, tilt, circuit safety, and 100% leak tests before it leaves the shipyard.

We handle export packing and shipping, supply the technical documents you need for registration, and provide 24/7 support, spare parts, and a 3-year hull warranty.
Every boat is built in-house, from raw plate to final inspection.






Custom boats designed for your mission, from concept to final delivery.
Certificates and class approvals for our shipyards, materials, and boats.


Inside our shipyards in Qingdao, Jinan, and Xinyi

Tell us your route, payload, or mission. We will reply within one business day with a recommended configuration and quotation, then handle design, production, and door-to-door delivery.